Vector PC-Duo Installation Guide Page 73

  • Download
  • Add to my manuals
  • Print
  • Page
    / 161
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 72
Gateway Configuration
73
If you set the Automatically start a new log file field to once weekly, the log files are named
as follows:
Audit Log File - Weekly
Time
Period
Log File Name
March 4,
2006
MACHINE-Gateway-2006-
03-04-00.CSV
March 11,
2006
MACHINE-Gateway-2006-
03-11-00.CSV
March 18,
2006
MACHINE-Gateway-2006-
03-18-00.CSV
NOTE: When planning scheduled downtime for PC-Duo Gateway maintenance and backups, be
aware that if a periodic task, such as deleting old log files, was scheduled to run during that
particular downtime period, it will not run until the next regularly scheduled period. If you have
stopped the PC-Duo Gateway during a scheduled audit log rollover, the rollover will occur when
you next restart the PC-Duo Gateway, and the newly generated events will be added to the
correct log file.
There are two types of operations to log:
Select Failed operations only to log only operation failures.
Select All operations, successful or failed to log all operations.
The Audit Database Connection fields provide real-time status on the underlying SQL
database containing the audit information.
Protocols tab
Enable protocols and configure UDP/IP, TCP/IP and SSL policies under the Protocols tab
of the General Settings Properties window.
Page view 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 160 161

Comments to this Manuals

No comments